SMOOTH SAILING

Replacing damaged wall studs – all foyer flooring structural timber has been replaced.

The old wall boards are being held at the rear of the property.

The concrete slab for the future under stage storage area, with the toilet hallway floor beams visible on the top left and the rear side of the front of the stage on the right.

Wall construction at the junction of the top of the rear kitchen window and  kitchen outside door.

 

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

One Response to

  1. sophie says:

    Impressive progresses, well done!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s